A fix is available
APAR status
Closed as program error.
Error description
You bring a CICS region up and it begins to connect to the CPSM CMAS. If the region has a large number of resources installed, the CPSM CONNECT process may take longer than desired. . As an example, in a CICS region which had 100,000 programs defined to it in the DFHCSD at startup, internal testing showed 49 seconds to complete the CONNECT process. The EYULOG in the CMAS showed the timing: . 12:00:00 EYUTS0001I CMASNAME Topology Connect for MASNAME Initiated - APPLID(MASNAME) CICSplex(PLEXNAME). 12:00:04 EYUNL0159I MASNAME Resource topology data retrieval complete. 12:00:49 EYUCL0012I CMASNAME Connection of CMASNAME to MASNAME complete. . CICS regions with fewer resources take less time to complete the CONNECT process. . . Additional Symptom(s) Search Keyword(s): KIXREVSVR
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: All CICSPlex SM V5R1M0 and V5R2M0 Users * **************************************************************** * PROBLEM DESCRIPTION: It may take a long time for a CMAS to * * perform Topology Connect for a MAS if * * the MAS has a large number of CICS * * resources installed at the time of the * * Connect process. * **************************************************************** * RECOMMENDATION: After applying the PTF that resolves this * * APAR, all CMASes must be restarted. Note * * that the restarts do not need to occur at * * the same time. * **************************************************************** When a MAS connects to a CMAS, the MAS sends to the CMAS a list of all CICS resources installed in the MAS at that time. The CMAS uses this list to build Topology resource maps for the MAS, that are used by the CMAS to determine where to send processing requests from the API or RTA. If the MAS has a large number of CICS resources installed, then the processing performed by the CMAS to build and store the resulting resource maps may take a long time to complete. Until this completes, the Topology Connect process, and access to the MAS from the API, is held up.
Problem conclusion
Method EYU0TSRA (TSRA), which runs in a CMAS to build and store the Topology resource maps for a MAS at MAS connect time, has been updated to optimize this process.
Temporary fix
********* * HIPER * ********* FIX AVAILABLE BY PTF ONLY
Comments
×**** PE16/05/17 FIX IN ERROR. SEE APAR PI62627 FOR DESCRIPTION
APAR Information
APAR number
PI54032
Reported component name
CICS TS Z/OS V5
Reported component ID
5655Y0400
Reported release
80M
Status
CLOSED PER
PE
NoPE
HIPER
YesHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2015-12-11
Closed date
2016-01-20
Last modified date
2016-05-24
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
UI34592 UI34593
Modules/Macros
EYU0TSRA
Fix information
Fixed component name
CICS TS Z/OS V5
Fixed component ID
5655Y0400
Applicable component levels
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSGMGV","label":"CICS Transaction Server"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"5.1","Edition":"","Line of Business":{"code":"LOB35","label":"Mainframe SW"}},{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SG19M","label":"APARs - z\/OS environment"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"5.1","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
24 May 2016