A fix is available
APAR status
Closed as program error.
Error description
With the upcoming GA release of CICS Transaction Server for z/OS Version 5 Release 4, a compatibility APAR is required for pre-V5R4M0 CPSM regions before they start communicating with V5R4M0 CPSM regions.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: All CICSPlex SM V5R1M0, V5R2M0 and V5R3M0 * * Users * **************************************************************** * PROBLEM DESCRIPTION: A compatibility APAR is required to * * tolerate a task load of zero (0) in a * * CPSM WLM target region, which can occur * * due to changes introduced in CICS * * Transaction Server for z/OS Version 5 * * Release 4 (CTS V5R4M0). * **************************************************************** * RECOMMENDATION: After applying the PTF that resolves this * * APAR, all CMASes and MASes must be * * restarted. Note that the restarts do not * * need to occur at the same time. * * * * This fix is being provided across all * * pre-V5R4M0 supported releases of CPSM as * * follows: * * * * - CPSM V4R1M0 - APAR PI81778 * * - CPSM V4R2M0 - APAR PI81778 * * - CPSM V5R1M0 - APAR PI81780 * * - CPSM V5R2M0 - APAR PI81780 * * - CPSM V5R3M0 - APAR PI81780 * * * * While the restarts do not need to occur at * * the same time, all pre-V5R4M0 CPSM CMASes * * and MASes should be restarted to run with * * the PTF that resolves the APAR for its * * release, before connecting into a CPSM * * network that contains CPSM V5R4M0 CMASes * * and MASes. * **************************************************************** Updates made in CTS V5R4M0 change most CPSM tasks in a MAS running with both CICS and CPSM at the CTS V5R4M0 level, including all long running MAS tasks, from user to system tasks. As such, it is possible for a CPSM target region running both CICS and CPSM at the CTS V5R4M0 level, to have a task load of zero (0). Updates are required for pre-CTS V5R4M0 CPSM regions to accommodate this: - MAS method EYU0WNAL (WNAL), which runs in a CPSM WLM routing region during route selection processing, must be updated to correct a situation where a task load of zero (0) for a target region could result in an affinity not being created. - CMAS methods EYU0WABA (WABA) and EYU0WABB (WABB), which run in a CMAS to create WLMAWAOR (WABA) and WLMATARG (WABB) resource table records when requested through the CPSM API, WUI or Explorer, must be updated to correct a situation where a task load of zero (0) for a target region could result in the ROUTEWGHT attribute being incorrect.
Problem conclusion
Updates have been made to WNAL, WABA and WABB to allow for target regions with a task load of zero (0).
Temporary fix
Comments
APAR Information
APAR number
PI81780
Reported component name
CICS TS Z/OS V5
Reported component ID
5655Y0400
Reported release
80M
Status
CLOSED PER
PE
NoPE
HIPER
YesHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2017-05-17
Closed date
2017-05-24
Last modified date
2017-06-20
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
UI47509 UI47511 UI47512 PI83329
Modules/Macros
CJA0WNAL CJB0WNAL CJC0WNAL CJD0WNAL CJE0WNAL CJF0WNAL EYU0WABA EYU0WABB EYU0WNAL
Fix information
Fixed component name
CICS TS Z/OS V5
Fixed component ID
5655Y0400
Applicable component levels
R00M PSY UI47512
UP17/05/26 P F705 ¢
R80M PSY UI47509
UP17/05/26 P F705 ¢
R90M PSY UI47511
UP17/05/26 P F705 ¢
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSGMGV","label":"CICS Transaction Server"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"5.1","Edition":"","Line of Business":{"code":"LOB35","label":"Mainframe SW"}},{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SG19M","label":"APARs - z\/OS environment"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"5.1","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
20 June 2017