IBM Support

IZ78599: NIM OPERATIONS SUCCEED WHEN SOCKET TIMED OUT TO CLIENT APPLIES TO AIX 6100-05

A fix is available

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • When running a nim operation against a client, the nim
    operation will succeed even if the connection to client
    timed out.
    This can be reproduced for example using a nim m_mkbosi
    operation and reset the client while the mksysb is
    running
    

Local fix

Problem summary

  • When running a NIM operation on a client, the NIM operation
    will report success even if the connection to the client timed
    out.
    
    For example, while defining a mksysb of a client and the
    network or client goes down, the incomplete mksysb may be
    marked as ready.
    

Problem conclusion

  • Properly determine the return value and report that to NIM.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IZ78599

  • Reported component name

    AIX 610 STD EDI

  • Reported component ID

    5765G6200

  • Reported release

    610

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Submitted date

    2010-07-02

  • Closed date

    2010-07-02

  • Last modified date

    2013-03-28

  • APAR is sysrouted FROM one or more of the following:

    IZ69104

  • APAR is sysrouted TO one or more of the following:

    U838352

Fix information

  • Fixed component name

    AIX 610 STD EDI

  • Fixed component ID

    5765G6200

Applicable component levels

  • R610 PSY U838352

       UP10/08/20 I 1000

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SG11Q","label":"AIX 6.1 HIPERS, APARs and Fixes"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"610","Edition":"","Line of Business":{"code":"LOB08","label":"Cognitive Systems"}},{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SSMV87","label":"AIX 6.1 Enterprise Edition"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"610","Edition":"","Line of Business":{"code":"LOB08","label":"Cognitive Systems"}},{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSMVAX","label":"AIX Express Edition"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"610","Edition":"","Line of Business":{"code":"LOB08","label":"Cognitive Systems"}},{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SSAUMY","label":"IBM AIX Enterprise Edition"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"610","Edition":"","Line of Business":{"code":"LOB08","label":"Cognitive Systems"}},{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SG11Q","label":"AIX 6.1 HIPERS, APARs and Fixes"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"610","Edition":"","Line of Business":{"code":"LOB08","label":"Cognitive Systems"}},{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SG11R","label":"APARs - AIX 7.1 environment"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"610","Edition":"","Line of Business":{"code":"LOB08","label":"Cognitive Systems"}}]

Document Information

Modified date:
17 December 2021