IBM Support

PK52408: WSIM TEST MANAGER REFRESH SCHEDULE E COMMAND

A fix is available

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as new function.

Error description

  • THE E REFRESH COMMAND HAS BEEN ADDED TO THE WSIM TEST MANAGER
    SCHEDULE PANEL. THE REFRESH COMMAND UPDATES THE WSIM NETWORK BY
    SETTING THE NTWRK SEQ= OPERAND TO THE NUMBER OF SIMULATED
    RESOURCES, UPDATES THE UTBL STATEMENTS, UPDATES THE PATH
    STATEMENTS, AND UPDATES THE PATH= OPERAND ON THE SIMULATED
    RESOURCES. THE REFRESH COMMAND IS USEFUL WHEN TESTGROUPS OR
    TESTCYCLES ARE ALTERED AND YOU NEED TO REFRESH THE WSIM NETWORK
    DEFINITION.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED: Users of IBM Workload Simulator (WSim)       *
    *                 Version 1 Release 1                          *
    ****************************************************************
    * PROBLEM DESCRIPTION: WSim Test Manager Refresh Schedule      *
    *                      E Command                               *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    The E Refresh command has been added to the WSim Test Manager
    schedule panel.  The Refresh command updates the WSim network
    by setting the NTWRK SEQ= operand to the number of simulated
    resources, updates the UTBL statements, updates the PATH
    statements, and updates the PATH= operand on the simulated
    resources.  The Refresh command is useful when testgroups
    or testcycles are altered and you need to refresh the WSim
    network definition.
    +-------------------------------------------------------------+
    + Please check our Communications Server for OS/390 homepages +
    + for common networking tips and fixes.  The URL for these    +
    + homepages can be found in Informational APAR II11334.       +
    +-------------------------------------------------------------+
    

Problem conclusion

Temporary fix

Comments

  • Added E Refresh command to WSim TM schedule panel and updated
    execs and panels to do the same operation as R Resources, with
    respect to updating an existing WSim network definition.
    

APAR Information

  • APAR number

    PK52408

  • Reported component name

    IBM WORKLOAD SI

  • Reported component ID

    5655I3900

  • Reported release

    110

  • Status

    CLOSED UR1

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2007-09-06

  • Closed date

    2007-09-12

  • Last modified date

    2007-10-02

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Modules/Macros

  • ITMES    ITMESN   ITMPS    ITMPSH   ITMPSN
    

Fix information

  • Fixed component name

    IBM WORKLOAD SI

  • Fixed component ID

    5655I3900

Applicable component levels

  • R110 PSY UK29140

       UP07/09/14 P F709

Fix is available

  • Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSL28L","label":"Workload Simulator for z\/OS and OS\/390"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"110","Edition":"","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]

Document Information

Modified date:
02 October 2007